Connection Process - Small, Mid-Sized 和 Large Embedded Generators (>10kW)

These are the steps that must be followed to connect an electricity generation source that will generate more than 10 kilowatts 和 operate at voltages below 50 kilovolts to 推荐几个网赌网站’s electricity grid.  Note that this is subject to change at any time. 

1. 初步协商

第一步是提交一个完成的 Form A – 初步协商 Application. We will establish the generator classification 和 provide you with the connection details for the proposed project 和 outline the available capacity. 

2. 连接影响评估申请

After the preliminary consultation, complete 和 submit Form B – 连接影响评估申请

3. 研究协议

在推荐几个网赌网站复习表格B之后, you will need to submit a signed 研究协议 along with payment for the 连接影响评估.

4. 连接影响评估

We conduct a 连接影响评估 和 issue a report. You will be allocated capacity on the grid upon completion of the 连接影响评估 by 推荐几个网赌网站 Utilities 和 Hydro One (if applicable). 

Note: For generators connecting on a Hydro One shared feeder, Hydro One will be required to perform its own 连接影响评估.

5. 连接成本协议

We will provide you with a cost estimate 和 will issue a 连接成本协议 specifying the scope of work to be performed either by you, 你的承包商或阿莱克特拉公用事业公司, 为了使世代连接.  

如果你决定继续这个项目, you must sign the 连接成本协议 和 make the required payments.

6. 设计和建造

We will perform the work required to make the connection. You or your contractor must complete the construction of the generation facility 和 then apply to the 电气安全 Authority for an electrical inspection. You must submit final detailed design documents to us for review. 

7. 调试

You will be required to complete 和 submit a 调试 Verification Report including the 调试验证表单

8. 连接协议

您将需要完成并提交 连接协议 在通电之前.

9. 连接、操作和维护

After the 电气安全 Authority provides the electrical inspection “Connection Authorization” directly to 推荐几个网赌网站 Utilities, the generation facility will be connected to 推荐几个网赌网站 Utilities’ distribution system. 

10. 援助

We will assist you in setting up the appropriate settlement arrangement based on the project type. 

Connection Process - Micro Generators (≤ 10 kW)

These are the steps that must be followed to connect an electricity generation source that will generate less than or equal to kilowatts 和 operate at voltages below 50 kilovolts to 推荐几个网赌网站’s electricity grid.  Note that this is subject to change at any time. 

1. 初步协商

第一步是提交一个完成的 Form A – 初步协商 Application. We will establish the generator classification 和 provide you with the connection details for the proposed project 和 outline the available capacity.

2. 连接应用程序

After the preliminary consultation, complete 和 submit Form C – Micro Generation 连接应用程序.

3. 提供连接

推荐几个网赌网站会审查申请, 一旦被接受, issue an 提供连接 which outlines the requirements 和 construction costs to connect the generator.

如果你决定继续这个项目, you will be required to pay the connection fees detailed in the 提供连接.

4. 设计和建造

Once the micro generation facility has been built according to our requirements, you will need to to apply to the 电气安全 Authority for an electrical inspection.

5. 调试

You will have to complete 和 submit a signed 调试验证表单

6. 连接协议

Prior to energization, you will need to complete 和 submit the 连接协议.

7. 连接、操作和维护

After the 电气安全 Authority provides us with the electrical inspection “Connection Authorization” we will install the bi-directional generation meter. 

We will work with you to set up the appropriate settlement arrangement based on the project type.

净计量

If you generate electricity from renewable sources, you may take advantage of Ontario’s “net metering” initiative. Net metering allows you to send excess electricity generated from renewable resources to the distribution system for a credit toward your energy costs. 

For more information about the net metering program, please see the 安大略省法规541/05 -净计量, 安大略省法规273/18 -净计量 和 Ontario Regulation 274/18 – Siting Restrictions

推荐几个网赌网站

推荐几个网赌网站公用事业公司  
电站设计-分布式发电  
161年Cityview大道,  
沃恩,安大略省,L4H 0A9 

推荐几个网赌网站在这里

电子邮件: DER@hpc3skjg.e2talk.net 

Is 你的位置?